Here are the climate-related sections of speeches by MPs during the Commons debate Planning Act 2008 (Amendment).
Full text: https://hansard.parliament.uk/Commons/2012-12-12/debates/12121240000003/PlanningAct2008(Amendment)
13:53 Phil Wilson (Sedgefield) (Lab)
I am pleased to report that County Durham has played more than its part in the development of renewable energy. The equivalent of 70% of the county’s household electricity comes from renewable sources; what is more, the equivalent of 27% of the county’s energy needs are already supplied from renewable sources, only 3% off the 2020 target of 30%. Some 68% of the renewable energy generated comes from wind energy. In total, 193 MW of renewable energy is either operational or approved, 132 MW from wind. A further 109 MW is in planning, all of it from wind energy. That is one of the best records of any local authority area in England.
I want to see further renewable energy development in the county, but as far as wind farm development is concerned, I believe the landscape in the county is near or at full capacity. If it is allowed to continue, the cumulative impact on the landscape will become severe. The county now hosts 17 operational wind farms, a further six have been permitted but are not yet operational, and another 13 are in planning. At present, County Durham has 70 commercial-scale turbines and a total of 155 turbines of various sizes. Another 72 turbines of all sizes are in planning, without counting the 24 turbines E.ON would like to build at the Isles in my constituency, which, on a good day, would generate 63.5 MW of electricity.
In fact, during the debates on the 1989 Act, wind farms did not take centre stage. The Government wanted to create a new tranche of renewable energy capacity, but hydro was mentioned rather than wind. In 1994, when Durham county council wrote “Renewable energy in County Durham”, the first strategy document of its kind to be prepared by a local authority, the average wind turbine generated 300 to 400 kW and had a tip height of 40 to 50 metres. By 2001, the wind farm at Tow Law in County Durham was furnished with the latest turbines, which generated 750 kW and stood 71 metres high. The technology has moved on apace, but so has the size of the turbines, from 40 to 50 metres at the end of the 1990s to well over 100 metres today. Some of the turbines destined for the Isles will be 126.5 metres high—six times the height of the Angel of the North or almost twice the height of Durham cathedral. Consequently, the Government should look at increasing the 50 MW threshold.
Exempting wind farms from the 50 MW planning threshold, especially in locations where wind farms already dominate and are close to communities, will ensure that other parts of the country, which need to play their part in developing renewable energy, including wind power, are not taken for granted.