VoteClimate: Great Western Railway Routes - 8th February 2016

Great Western Railway Routes - 8th February 2016

Here are the climate-related sections of speeches by MPs during the Commons debate Great Western Railway Routes.

Full text: https://hansard.parliament.uk/Commons/2016-02-08/debates/16020817000001/GreatWesternRailwayRoutes

19:16 Mr Ben Bradshaw (Exeter) (Lab)

As hon. Members will remember, two years ago last week we had the catastrophic severing of the line at Dawlish. As the hon. Member for Torbay said, it had a huge impact on the region’s wider economy. Flooding then cut the line on the Somerset levels and this weekend there was flooding between Taunton and Castle Cary. My train was diverted from Exeter because of flooding. There are a lot of resilience problems throughout the network. As we all know, with the growing threat from climate change there will be increasing occurrences of extreme weather events. There has been meaningful and substantial investment in the railways, including in the south-west—although not as much as in other parts of the UK. Following the Hatfield disaster, hon. Members will remember that under the Labour Government there was a major programme of work to make signalling and track safer. That work is ongoing. Improvements at Reading have already made a significant positive difference to the reliability of the service. There used to be regular delays, in particular when coming into Reading on the return journey.

I completely agree with the point made by the hon. Member for Totnes (Dr Wollaston). We do not want to lose the line at Dawlish. It is beautiful and the people of Dawlish do not want to lose it. However, the fact is that if we talk to any engineer or climate change scientist about the long-term viability of the route, they do not just talk about storms and sea level rises but the fragility of the cliff. The biggest problem with the block last year was that the cliff kept falling down. It is a multiple problem and the line is between the sea and quite a soft cliff. As hon. Members will know, there was a plan back in 1939 to build a sensible, slightly inland alternative from Powderham Castle to Newton Abbot. That did not go ahead because the second world war broke out. There are other options. I can understand that people in north Devon and north Cornwall like the idea of the Okehampton line being reopened. Let us have a look at that and have some idea about what is going to happen and when. As the Prime Minister himself said, we cannot afford to have the south-west cut off like that again. Our economy cannot afford it. I was on the right side of that block, so it did not affect me, but the Plymouth, Cornwall, South Devon and Torbay economies were seriously affected by it.

[Source]

19:32 Anne Marie Morris (Newton Abbot) (Con)

Still more work is ongoing. The point made about signalling is absolutely right. More signalling repair and restoration is going on, along with more repairs to the sea wall, whose footpath has been repaired. Riviera terrace, which disappeared overnight, has now been rebuilt. As for Dawlish Warren along the coast, the point has been made that there are some natural climate change erosion problems, but work is already going on to deal with them through beach recharge and trying to realign how the natural coastal flow works.

[Source]

See all Parliamentary Speeches Mentioning Climate

Live feeds of all MPs' climate speeches: Twitter @@VoteClimateBot, Instagram @VoteClimate_UK

Maximise your vote to save the planet.

Join Now